City Electrical Factors (CEF) IT and Marketing Office, Durham, UK

  • Tipo de Edificio:
  • Edificios de Oficinas
Pantalla completa Cerrar Street View

For the new CEF Date, IT and Marketing Centre the architects Faulkner Brown wanted a “technologically cutting-edge building”

A kit of parts approach was taken and 90nr DELTABEAM®s were incorporated into the design along with Peikko Column Shoes & Anchor bolts. DELTABEAM® Composite Beams providing a slim floor and flat soffit also interfaced with precast floor units which incorporated combined heating & cooling system, creating a Thermally Active Building System (TABS). The frame was delivered the 11-week contractual period.

The new CEF headquarters also secured the 2019 RIBA Northeast Building of the Year Award.

Leer más down-arrow.png

Datos del proyecto

Tamaño del poyecto:
2100 m2
Pavimentos:
2
Inversor:
CEF Ltd
Empresa Constructora:
PCE Ltd
Ingeniería, Calculista:
Curtins
Arquitecto:
FaulknerBrowns
Año de construcción:
2016
Año de finalización:
2017

Habla con expertos

Michael Scott

Michael Scott

Sales Manager, Deltabeam Products

England & Wales

Tel. +44 1325 318619
Mob. +44 755 7118470
[email protected]