The building is constructed with prefabricated elements consisting of DELTABEAM® Frame, hollow core slabs and stabilizing concrete walls.
The use of DELTABEAM® Frame made it possible for the contractor NCC to assemble the shell of the building much faster than when using a traditional system. Continuous composite columns combined with DELTABEAM® Composite Beams on consoles formed the basis for the quick assembly.
Vertical wall joints were carried out with SUMO® Wall Shoes and HPM® Anchor Bolts.
The construction will be classified according to the certification scheme DGNB Guld, which guarantees that the property meets the highest standards in environmental, social and economic sustainability.