E18 Turku Ring Road, Kaarina, Finland

  • Tipo de Edificio:
  • Insfraestructuras
Pantalla completa Cerrar

Achieving Construction Efficiency Using PSB® Punching Reinforcement System.

The highway intersection in Kirismäki is part of the improvement project of E18 Turku Ring Road.

Construction for the intersection included pile supported embankment slabs which are reinforced against punching failure with Peikko's ETA assessed PSB® Punching Reinforcement system.

Prefabricated double-headed stud rails make flat slab construction possible. Construction time was reduced compared to traditional pile supported mushroom shaped slabs.

Datos del proyecto

Tamaño del poyecto:
900 m2
Inversor:
Väylävirasto
Empresa Constructora:
Destia Oy
Ingeniería, Calculista:
WSP Finland Oy
Año de construcción:
2021
Año de finalización:
2021

Habla con expertos

Topi Laiho

Topi Laiho

Product Manager

Bolt Connections

Mob. 040 776 2503
[email protected]