Peikko delivered more than 200 meters of DELTABEAM® composite beams and 18 composite columns for the new office building of Hegeman in Nijverdal. This combination of steel and concrete ensures a high rigidity and integrated fire resistance. The concrete columns at the ground level are equipped with Peikko HPKM® column shoes, which are a guarantee for a fast, efficient and safe building method.