PRD Logistics Warehouse, Corbas, France

  • Tipo de Edificio:
  • Edificios de Almacenamiento
Pantalla completa Cerrar

A new logistics building of nearly 77,000m² which is divided into nine cells. The PETRA® Slab Hangers allowed a quick installation of the hollow-core slabs.

This is the first time using PETRA® Slab Hangers for the Eurobéton team. The installation of the floor was made easier by thier use

Datos del proyecto

Tamaño del poyecto:
77,000 m2
Inversor:
PRD
Arquitecto:
Eric Sainero
Prefabricador:
Eurobeton France

Habla con expertos

Sabri ALPTUNA

Sabri ALPTUNA

Directeur commercial adjoint

Mob. +33 (0) 6 47 86 91 55
[email protected]