Smedbyskolan, Norrköping, Sweden

  • Tipo de Edificio:
  • Educación y Cultura
Pantalla completa Cerrar

New school in Smedby, Norrköping

In May 2021, the construction of school in Smedby started after the previous school built 1960 was demolished. The new school is two storeys and accommodates grades F-6. An associated sports hall was also built as part of the project.

The new school has two classes per grade and is designed to meet modern educational needs.

Peikko has delivered the slim floor structure of DELTABEAM® and DELTABEAM® Frame, which offers several advantages for modern school environments. The frame was adapted to meet the school's need for large, open spaces with long spans and few columns. The solution provided flexibility and an optimal learning environment for both students and teachers.

Leer más down-arrow.png

Datos del proyecto

Tamaño del poyecto:
5000 m2
Pavimentos:
2
Inversor:
Norrevo
Empresa Constructora:
ED-Bygg
Ingeniería, Calculista:
ARQLY
Arquitecto:
Tyréns
Prefabricador:
Budizol
Año de construcción:
2022
Año de finalización:
2024

Habla con expertos